Rapid Deployment of Sewer and Water Supply Network for S.K Builders & Developers in Pusapatirega

Project Duration

20 days

Services Provided

Sewer and water supply network

Products Used

Supreme Pipes 
Ultra Manhole

arae arrange ment of water pipe line
sewer and water service network area
workers fitting and arranging pipess
pipe line at the site
work area view from drone
pipe line in construction site

Project Background

S.K Builders approached Leenus India for a project in Pusapatirega, that needed their help with design, material procurement, and installation of a comprehensive piping network for their 17-acre residential development project in Pusapatirega. . Installation of sewer and water pipelines on a 17-acre site while dealing with a very strict deadline .

Challenges

One of the most unpredictable weather conditions challenged Leenus India in this project, especially heavy rains. Continuous excavation-refilling of the pipelines to avoid any disturbance that might happen due to rain was carried out. This refilling process after every 20 meters of laying pipes added to the time taken to complete the project.

Solutions and Approach

To meet these challenges, Leenus India deployed a strategic and methodical  approach:

  • Detailed planning: This involved designing an all-embracing plan that articulated each stage of the project. We followed regularly updated forecasts to mitigate the effects of rainfall by excavating and back filling smaller parts.
  • Premium Materials: We used pipes from supreme industries that were of high quality and regularly checked for standard compliance.
  • Efficient Workforce Management: Our skilled professionals worked in shifts to ensure round-the-clock progress. The engineers who had worked in this field before were supervising technically performance based issues on site.
  • Premium Materials: The use of advanced trenchless technology reduced disturbances and improved installation time.

Execution

Despite encountering difficulties, Leenus India’s professionals saw through the successful installation of effluent and water supply pipes with expertise and efficiency :

  • Site preparation: Our team cleared the land, indicated roadways for the flow of rainwater, and conducted soil testing.
  • Material delivery:Through just-in-time delivery, materials required were provided continuously.
  • Installation: This process was subdivided into parts and every team took care of its own section. Consistent quality inspections were done for compliance with industry requirements.
  • Testing and Commissioning: To ensure efficiency and reliability, extensive testing was carried out. There also existed prompt rectification of small faults for better performance.
Solutions and Approach

To meet these challenges, Leenus India deployed a strategic and methodical  approach:

  • Detailed planning: This involved designing an all-embracing plan that articulated each stage of the project. We followed regularly updated forecasts to mitigate the effects of rainfall by excavating and back filling smaller parts.
  • Premium Materials: We used pipes from supreme industries that were of high quality and regularly checked for standard compliance.
  • Efficient Workforce Management: Our skilled professionals worked in shifts to ensure round-the-clock progress. The engineers who had worked in this field before were supervising technical performance based issues on site.
  • Premium Materials: The use of advanced trenchless technology reduced disturbances and improved installation time.
Execution

Despite encountering difficulties, Leenus India’s professionals saw through the successful installation of effluent and water supply pipes with expertise and efficiency
:

  • Site preparation: Our team cleared the land, indicated roadways for the flow of rainwater, and conducted soil testing.
  • Material delivery:Through just-in-time delivery, materials required were provided continuously.
  • Installation: This process was subdivided into parts and every team took care of its own section. Consistent quality inspections were done for compliance with industry requirements.
  • Testing and Commissioning: To ensure efficiency and reliability, extensive testing was carried out. There also existed prompt rectification of small faults for better performance.

Outcomes

Timely Completion


Despite the setbacks caused by the weather, Leenus India successfully completed the project within the 20-day timeframe, showcasing their commitment to meeting deadlines.

Enhanced Efficiency


The strategic approach of refilling the pipes at regular intervals improved the efficiency of the installation process, ultimately leading to a smoother execution of the project.

Client Satisfaction


S.K Builders & Developers were highly satisfied with the quality of work provided by Leenus India, as well as their ability to overcome challenges and deliver results.

Client testimonial

“Leenus India’s professionalism and expertise were instrumental in the successful completion of our project in Pusapatirega. Despite facing challenging weather conditions, they delivered a high-quality piping network within the agreed timeline, showcasing their commitment to excellence.”