Project Duration
61 days
Services Provided
Sewerage and water supply network
Products Used
Supreme Pipes
Ultra Manhole
Detailed Planning:
With the help of Leenus India, a phased project plan was developed to work simultaneously on multiple site sections due to the rocky terrain.A geotechnical survey mapped rock formations which guided excavation and pipe-laying We tracked daily progress to stay on schedule.
Premium Materials:
Tough conditions also mandated the selection of high-grade piping from Supreme Industries. Quality control measures ensured the pipes met strict industry standards. This improved the long-term reliability of sewer and stormwater systems.
Efficient Workforce Management:
Professionals matriculated for 24 hours and were done in shifts. Senior engineers kept a close eye on the progress and immediate solving of technical issues, which made it easier for management to deploy and at the right time honing of product.
Advanced Techniques:
In order to deal with the rocky terrain, Leenus India employed specialised machinery to excavate trenches and rocks. Trenchless technology was used in areas of rock. It made traditional digging ineffective. This reduced surface disturbances and sped up installation.
Site Planning:
Before construction, the team conducted a geotech analysis. It mapped rock layers and planned excavation paths. Thereby, the study was able to refine some of the processes and reduce any unexpected barriers that would stand in the way and cause bottlenecks.
Material Delivery:
To avoid having too few or too many supplies, the material is delivered according to J.I.T. This means that, based on demand, material should be delivered at the required time. This way, there wouldn’t be excess material to store for future work.
Installation:
The project team broke down the project into defined areas, and various teams managed different parts of the pipeline. The division of labor resulted in more focused and efficient work thus rapid progress. With every pipe installed, comprehensive quality checks were done to ensure all of the sewer and stormwater pipelines met strict requirements.
Testing and Commissioning:
After installation, we tested the pipeline systems. This was to check their function and integrity. Any minor defects were immediately cleared out to ensure that there would be maximum performance before handing over the project.
Strategic systems of manpower management and application of special excavation methods helped the project get done without unnecessary waste of time. This is the operational style employed by Leenus India in addressing complicated building projects.