RRR Choutuppal

Project Duration 

61 days

Services Provided

Sewerage and water supply  network

Products Used

Supreme Pipes
Ultra Manhole 

Project Background

An area of around 40 acres in the RRR Choutuppal project was designated for the installation of sewer and stormwater pipelines. Grupe Builders & Developers LLP approached Leenus India to undertake this project. The construction covered a total length of 6,470 meters and 8.114 kilometres for the sewer carriers to collective pipelines, making it one of the largest interventions. Leenus India was tasked with completing the project within a tight timeline of 61 days, maintaining high-quality standards, and ensuring a fully safe work environment at all times.

Challenges

The rocky terrain in Choutuppal posed a major challenge for Leenus India during the project. The site was highly consolidated with massive hard rock formations, making excavations for pipeline installation both difficult and time-consuming.

Solutions and Approach

The above challenges had to be faced back on the system, which includes how Leenus India went on working through a planned and systematic approach:
  • Proper Planning: Our team made a proper assessment of site and accordingly planned pipeline routes in such a manner such that it would reduce the quantum of excavation coupled with a comprehensive plan. Our proactive approach assured that no hurdles come in executing the job and all jobs were completed within the scheduled timeframe.
  • Quality Materials: For the sewer system, we made use of high-quality Supreme pipes made of PVC and HDPE, sourced from Supreme Industries. Such pipelines were used for the reason that they are at high resistance to all kinds of corrosion, as well as other local factors that they might be exposed to.
  • Advanced Techniques: This involved the use of advanced trenchless technology through horizontal drilling to reduce disruption on the surface and speed up the installation process. Such was particularly the case for those instances where the meetings passed through strict terrain that did not compromise the integrity of the surrounding structure in any way.

Execution

  • Site preparation: The site was leveled and cleared in order to lay the base for a stable pipeline installation. Safety measurements were taken in order to protect not only the laborers on site but also the community Individuals within the environs.
  • Material delivery:Best quality PVC pipes and HDPE pipes manufactured by Supreme Industries were supplied well in time at the site, thereby ensuring work continuity without any inhibition and its completion according to schedule .
  • Installation: Our competent technicians fitted the pipes properly, ensuring that, at all joints, there was perfect line alignment, jointing, and sealing to avoid leakages and to optimize flow. The quality of installations was checked at regular intervals.
  • Testing and Commissioning: After the installation, intensive testing operation was carried out on the sewer system to prove it for its working and conformation to the local authority’s regulations. The system was commissioned with final adjustments in order to ensure it works as it should.
Solutions and Approach

Detailed Planning:
With the help of Leenus India, a phased project plan was developed to work simultaneously on multiple site sections due to the rocky terrain.A geotechnical survey mapped rock formations which guided excavation and pipe-laying We tracked daily progress to stay on schedule.
Premium Materials:
Tough conditions also mandated the selection of high-grade piping from Supreme Industries. Quality control measures ensured the pipes met strict industry standards. This improved the long-term reliability of sewer and stormwater systems.
Efficient Workforce Management:
Professionals matriculated for 24 hours and were done in shifts. Senior engineers kept a close eye on the progress and immediate solving of technical issues, which made it easier for management to deploy and at the right time honing of product.
Advanced Techniques:
In order to deal with the rocky terrain, Leenus India employed specialised machinery to excavate trenches and rocks. Trenchless technology was used in areas of rock. It made traditional digging ineffective. This reduced surface disturbances and sped up installation.

Execution

Site Planning:
Before construction, the team conducted a geotech analysis. It mapped rock layers and planned excavation paths. Thereby, the study was able to refine some of the processes and reduce any unexpected barriers that would stand in the way and cause bottlenecks.

Material Delivery:
To avoid having too few or too many supplies, the material is delivered according to J.I.T. This means that, based on demand, material should be delivered at the required time. This way, there wouldn’t be excess material to store for future work.

Installation:
The project team broke down the project into defined areas, and various teams managed different parts of the pipeline. The division of labor resulted in more focused and efficient work thus rapid progress. With every pipe installed, comprehensive quality checks were done to ensure all of the sewer and stormwater pipelines met strict requirements.

Testing and Commissioning:
After installation, we tested the pipeline systems. This was to check their function and integrity. Any minor defects were immediately cleared out to ensure that there would be maximum performance before handing over the project.

Timely Completion
Logistically this is a sharp turn. Even though the working environment was challenging and rocky, Leenus India met the 61-day deadline for the execution of the project. This impressively showcased their ability to remain within rings timelines even when faced with the most challenging situations.
Enhanced Efficiency

Strategic systems of manpower management and application of special excavation methods helped the project get done without unnecessary waste of time. This is the operational style employed by Leenus India in addressing complicated building projects.

Client Satisfaction
Grupe Builders & Developers LLP praised Leenus India for their professionalism, technical expertise, and ability to adapt to challenging site conditions. They were particularly impressed with the team’s dedication to maintaining high standards of quality

Conclusion

The project at RRR Choutuppal — a partnership between Leenus India and Grupe Builders & Developers LLP — demonstrates the skill of Leenus with more challenging projects on a larger scale. Leenus India entered into the project with a strong planned out strategy that enabled them to overcome the hard rocky terrain and demanding nature of the work, due to which eventually they were able to lay both sewer and stormwater pipelines promptly using advanced technologies along with readily available labor force. The successful implementation of this project is a testament to Leenus India as the best water management company in Bangalore which keeps its word and delivers high-quality solutions even under adverse conditions.
Get a quick enquiry