Swift Sewer System Installation in Challenging Hilly Terrain for YBR - Avasa Pride by Leenus India
Project Duration
7 days
Services Provided
Sewerage network
Products Used
Supreme Pipes
Ultra Manhole &
Inspection Chambers








Project Background
YBR – AVASA PRIDE contracted Leenus India to design, supply materials, and do the installation of an elaborate sewer system in a 9-acre residential development at Ramdas Pally, Ibrahimpatnam. The challenging project was experienced due to the fact that it was a hilly terrain with a requirement for efficient drainage in a densely populated area.
Challenges
- Hilly area with massive excavation and blasting of stones involved in making the required pipeline routes
- The continuous flow of water without any stagnation and saturation in the system
- Causing least disturbance to the residential surrounding area during construction
Solutions and Approach
- Proper Planning: Our team made a proper assessment of site and accordingly planned pipeline routes in such a manner such that it would reduce the quantum of excavation coupled with a comprehensive plan. Our proactive approach assured that no hurdles come in executing the job and all jobs were completed within the scheduled timeframe.
- Quality Materials: For the sewer system, we made use of high-quality Supreme pipes made of PVC and HDPE, sourced from Supreme Industries. Such pipelines were used for the reason that they are at high resistance to all kinds of corrosion, as well as other local factors that they might be exposed to.
- Advanced Techniques: This involved the use of advanced trenchless technology through horizontal drilling to reduce disruption on the surface and speed up the installation process. Such was particularly the case for those instances where the meetings passed through strict terrain that did not compromise the integrity of the surrounding structure in any way.
Execution
- Site preparation: The site was leveled and cleared in order to lay the base for a stable pipeline installation. Safety measurements were taken in order to protect not only the laborers on site but also the community Individuals within the environs.
- Material delivery:Best quality PVC pipes and HDPE pipes manufactured by Supreme Industries were supplied well in time at the site, thereby ensuring work continuity without any inhibition and its completion according to schedule .
- Installation: Our competent technicians fitted the pipes properly, ensuring that, at all joints, there was perfect line alignment, jointing, and sealing to avoid leakages and to optimize flow. The quality of installations was checked at regular intervals.
- Testing and Commissioning: After the installation, intensive testing operation was carried out on the sewer system to prove it for its working and conformation to the local authority’s regulations. The system was commissioned with final adjustments in order to ensure it works as it should.
Solutions and Approach
The above challenges had to be faced back on the system, which includes how Leenus India went on working through a planned and systematic approach:
- Proper Planning:
Our team made a proper assessment of site and accordingly pipeline routes in such a manner that it would reduce the quantum of excavation coupled with a comprehensive plan. Our proactive approach assured that no hurdles come in executing the job and all jobs were completed within the scheduled timeframe. - Quality Materials:
For the sewer system, we made use of high-quality Supreme pipes made of PVC and HDPE, sourced from Supreme Industries. Such pipelines were used for the reason that they are at high resistance to all kinds of corrosion, as well as other local factors that they might be exposed to. - Advanced Techniques:
This involved the use of advanced trenchless technology through horizontal drilling to reduce disruption on the surface and speed up the installation process.This approach was particularly effective in instances where the meetings passed through difficult terrain, ensuring that the integrity of the surrounding structures remained uncompromised
Execution
Despite encountering difficulties, Leenus India’s professionals saw through the successful installation of effluent and water supply pipes with expertise and efficiency :
- Site preparation:
Our team cleared the land, indicated roadways for the flow of rainwater, and conducted soil testing. - Material delivery:
Through just-in-time delivery, materials required were provided continuously. - Installation:
This process was subdivided into parts and every team took care of its own section. Consistent quality inspections were done for compliance with industry requirements. - Testing and Commissioning:
After the installation, intensive testing operation was carried out on the sewer system to prove that it’s working and complying to the regulations set by local authorities. The system was commissioned with final adjustments in order to ensure it works as it should.